N E S W 14°
01 / 19
RWY 01/19
HDG 14°
LEN 7,215 ft
Perugia San Francesco d'Assisi – Umbria International Airport

Runway 01 at LIRZ

Runway 01/19 at Perugia San Francesco d'Assisi – Umbria International Airport (LIRZ) in Perugia is a 7,215 ft, lighted, asphalt runway oriented 014°/194°. The runway is 148 ft wide, with a 328 ft displaced threshold on the 01 end. SkyMeter has observed 425 landings and 217 departures on this runway over the last 30 days, with approximately 0.2% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.4°, touchdowns averaging 658 ft past the threshold, a typical touchdown ground speed of 122 kt, a 2.6 kt average crosswind component, a 1.2 kt average tailwind.

Last 30 Days
642 Operations
217 Deps / 425 Arrs

Runway 01/19 at Perugia San Francesco d'Assisi – Umbria International Airport (LIRZ) in Perugia is a 7,215 ft, lighted, asphalt runway oriented 014°/194°. The runway is 148 ft wide, with a 328 ft displaced threshold on the 01 end. SkyMeter has observed 425 landings and 217 departures on this runway over the last 30 days, with approximately 0.2% of arrivals resulting in a go-around (1 events). Trace data shows an average final-approach slope of 2.4°, touchdowns averaging 658 ft past the threshold, a typical touchdown ground speed of 122 kt, a 2.6 kt average crosswind component, a 1.2 kt average tailwind.

Runway at a Glance

Arrival Volume

425 landings observed on Runway 01 in the last 30 days, alongside 217 departures.

Low Go-Around Rate

0.2% of arrivals at Runway 01 result in a go-around (1 in the last 30 days).

Peak Hour

Busiest landing window observed at 15:00 with 10 arrivals on the recent sample.

Average Touchdown Zone

Aircraft touch down on average 658 ft from the threshold on Runway 01.

Prevailing Wind & Gust History

Over the past 365 days, winds at LIRZ have prevailed from the north (0°), accounting for roughly 24% of windy observations. Average wind speed sits at 5.4 kt with peak gusts to 39 kt. Strong-wind days are infrequent here.

Light Crosswind Component

Average crosswind on landing is 2.6 kt at touchdown, measured against runway 01 alignment.

Approach Slope

Final-approach slope averages 2.4° on Runway 01, shallower than the standard 3°.

Landing Behavior and Touchdown Performance

The metrics below are computed from ADS-B trace data observed at Runway 01 over the last 30 days. Each value is shown only when at least 10 valid samples were available; sparse cells are hidden rather than estimated.

Avg approach slope
2.4°
Avg touchdown GS
122 kts
Avg touchdown zone
658 ft
Avg headwind
-1.2 kt

Hourly Landing Distribution

06:00 2 landings
07:00 4 landings
08:00 2 landings
09:00 2 landings
10:00 6 landings
11:00 5 landings
12:00 2 landings
13:00 5 landings
14:00 3 landings
15:00 10 landings
16:00 2 landings
17:00 3 landings
18:00 2 landings
19:00 2 landings

Recent observed landings on Runway 01 grouped by hour-of-day (UTC).

Go-Around Analysis

A go-around occurs when a pilot aborts a landing attempt and initiates a climb to return for another approach. While go-arounds are a normal safety procedure, their frequency and causes provide insight into operational challenges at specific runways. Runway 01 experienced go-arounds in 0.2% of arrivals over the last 30 days (1 events of 426 attempts).

Recent Go-Around Events

05f11c8d-18e4-4240-8ce5-c0bd39654109
2026-08-06 06:45
Unstable Approach

These events represent normal safety procedures and do not indicate operational deficiencies.

Go-Around Causes Distribution

Unstable Approach 1 events (100%)

Environmental factors dominate go-around causes, indicating that operational procedures remain sound.

Approach Types and Categories

Aircraft approach runways using different procedures based on weather conditions, visibility, and available navigation equipment. An Instrument Landing System (ILS) approach provides precision horizontal and vertical guidance using ground-based radio signals, enabling aircraft to land in low visibility conditions. Visual approaches require pilots to maintain visual contact with the runway and surrounding terrain, typically used during clear weather. Area Navigation (RNAV) approaches use GPS technology to guide aircraft along specific flight paths.

Approach Categories Explained

Category (CAT) classifications define minimum visibility and decision height requirements for instrument approaches. Higher categories enable operations in lower visibility conditions.

CAT I
Decision Height: 200 ft
Visibility: 550m
CAT II
Decision Height: 100 ft
Visibility: 300m
CAT III
Decision Height: 0-50 ft
Visibility: 0-200m
Visual
Clear of Clouds
Visibility: 5 km

Wind and Environmental Factors

Wind conditions directly impact runway operations, influencing approach difficulty, landing performance, and runway selection. Runway 01 benefits from favorable wind alignment, with prevailing winds creating minimal crosswind components for most operations. Average wind speeds of 12 knots pose no operational constraints for commercial aircraft.

24-Hour Wind Pattern

11:00
48° at 3 kts, gusting 0 kts
3 kts
12:00
130° at 4 kts, gusting 0 kts
4 kts
13:00
170° at 7 kts, gusting 0 kts
7 kts
14:00
147° at 5 kts, gusting 0 kts
5 kts
15:00
184° at 8 kts, gusting 0 kts
8 kts
19:00
225° at 6 kts, gusting 0 kts
6 kts
07:00
92° at 6 kts, gusting 0 kts
6 kts
10:00
15° at 2 kts, gusting 0 kts
2 kts
17:00
190° at 4 kts, gusting 0 kts
4 kts
18:00
230° at 3 kts, gusting 0 kts
3 kts
06:00
180° at 5 kts, gusting 0 kts
5 kts
09:00
0° at 2 kts, gusting 0 kts
2 kts
16:00
235° at 11 kts, gusting 0 kts
11 kts
08:00
150° at 4 kts, gusting 0 kts
4 kts
METAR
260° at 6 kts, gusting 0 kts
6 kts

Wind patterns show typical diurnal variation with stronger winds during midday hours.

Average Speed
12 kts
Peak Gust
18 kts
Prevailing Direction
14°
Avg Crosswind
8 kts

Related Pages

About This Data

This analysis covers 642 operations recorded over the past 30 days, derived from global ADS-B flight broadcasts. Coverage may be incomplete in areas with limited ground-station reception, and statistics may vary with weather and traffic volume.